top of page

REHABILITATION FACILITIES

- REHABILITATION PROJECTS  -

BAGHDAD HOTEL

BAGHDAD HOTEL

Baghdad, Iraq Date: 2011 Client: Ministry of Foreign Affairs-Preparatory Committee For Arab Summit Budget: US$ 14 M This high rise 5 stars Hotel in the heart of the Capital City of Baghdad was renovated in preparation for the Arab Summit held in Baghdad.

BABYLON HOTEL

BABYLON HOTEL

Baghdad, Iraq Date: 2011 Client: Ministry of Foreign Affairs-Preparatory Committee For Arab Summit Budget: US$ 30 M This magnificent 5 star Hotel in the heart of the Capital City of Baghdad was renovated in preparation for the Arab Summit to be held in Baghdad.

MINISTRY OF PLANNING

MINISTRY OF PLANNING

Baghdad-Iraq Date: 2004 Client: Ministry of Planning Budget: US$ 25 M DIJLAH in joint venture with Dar Al-Amara Consulting Engineers, prepared all drawings and documentation for the Ministry of Planning and Development Cooperation to rehabilitate as a turn-key project after being bombed in the last Gulf War in March 2003. The building was severely damaged and burnt which requires a total make over. DIJLAH proposed preliminary redesign for the Ministry building.

MINISTRY OF INDUSTRY

MINISTRY OF INDUSTRY

Project Commencement: 7/2004 Project Completion: 1/2005, Total Project Cost: 5 Million US$ Location of Project: Baghdad – IRAQ Consultant: Dijlah Consultant Engineers, joint venture with Diwan

bottom of page