ROAD AND BRIDGES

- Road & Bridges -

BAGHDAD - ABU GHRAIB ROAD

BAGHDAD - ABU GHRAIB ROAD

Date: 2012 Client: Baghdad Governorate Contractor: Bairaq Al-Ameer General Trading & Contracting Ltd. Budget: US$ 10 M Dijlah has prepared the preliminary studies and designs to develop Baghdad – Abu-Ghraib road 18 km lengths.

QUWAYRISH INTERCHANGE

QUWAYRISH INTERCHANGE

Baghdad, Iraq Date: 2012 Client: Bairaq Al-Ameer General Trading & Contracting Ltd. Budget: US$ 70 M This proposal for an Interchange in the City of Baghdad.

PILGRIM'S TUNNEL( PROPOSAL )

PILGRIM'S TUNNEL( PROPOSAL )

Kufa, Iraq Date: 2012 Client: Al-Khadraa Al-Muttahida Contracting Co. Budget: US$ This proposal for an underground Tunnel in the City of Kufa. This tunnel has a total of 6 lanes, 3 lanes in each direction. Its main purpose is to transport Pilgrims to and from Masjid Al-Kufa.

DEVELOPMENT OF BAGHDAD-AL HILLAH Rd.

DEVELOPMENT OF BAGHDAD-AL HILLAH Rd.

Baghdad-Hilla, Iraq Date: 2012 Client: Bairaq-el-Ameer Company for General Contracting and Trading Budget: US$ 30 M Baghdad-Hilla Road connects between the Capital City Baghdad and the City of Hilla, with a length of 30 Km. The preparation of design drawings according to the technical specifications of roads and bridges (SCRB), and a topographic survey that has been conducted for this project with the design of three traffic overpass interchanges.

SAYF SA`D INTERCHANGE IN KARBALA

SAYF SA`D INTERCHANGE IN KARBALA

Karbala, Iraq Date: 2007 - 2011 Client: Project International FZE Budget: US$ 15 M For this interchange, traffic study was taken into consideration in design. In addition to the overpass, roads were designed with all approaches needed. Currently, This project consists of a 2-sided overpass with 4 curved ramps and 4 linear ramps.

SANHARIB INTERCHANGE

SANHARIB INTERCHANGE

Mosul, Iraq Date: 2010 Client: Nineveh Governorate Budget: US$ 130 M This project is located in the East side of Mosul with length of 2.6 km (two directions). The interchange runs over three interchanges in the following: Al-Faisalyia, Al-Zira`ah with tunnel design with each interchange, and Al-Dhubbat at end of interchange which is considered as one of most complicated traffic interchanges which connects surrounding areas with the West section of Mosul.

AL-TANKY INTERCHANGE, Al-Muthana, Iraq

AL-TANKY INTERCHANGE, Al-Muthana, Iraq

Samawa City, Iraq Date: 2010 Client: Al-Khadraa Co. Budget: US$ 16 M This proposal for interchange in the City of Samawa.

AL-SHUHADA’ INTERCHANGE

AL-SHUHADA’ INTERCHANGE

Kirkuk, Iraq Date: 2005-2006 Client: Ministry of Municipalities and Public Works Budget: US$ 6 M Al-Shuhada' Interchange in Kirkuk, Iraq. For this interchange, traffic study was taken into consideration in design. This is a major interchange in Kirkuk. It consists mainly of one 2-sided overpass with all approaches.

SADR HOSPITALITY INTERCHANGE

SADR HOSPITALITY INTERCHANGE

Najaf, Iraq Date: 2010 Client: Al-Khadraa Co Budget: US$ 23 M This Proposal for Interchange to be located in the Holy City of Najaf.

TAHMAZIYAH INTERCHANGE

TAHMAZIYAH INTERCHANGE

Hilla, Iraq Date: 2005-2008 Client: Ministry Municipalities & Public Works Budget: US$ 5 M For this interchange, traffic study was taken into consideration in design. This is a major interchange in Al-Hillah, Babylon. This interchange consists mainly of one 2-sided overpass with all required approaches. Also, roads were designed to achieve the optimum traffic flow.

AMARAH BRIDGE

AMARAH BRIDGE

Amarah, Iraq Date: 2007 Client: Maysan Governorate Council Budget: US $2.5 M DIJLAH prepared all the necessary engineering drawings and documents for the steel structure bridge in Amarah, South of Iraq. This bridge is located on Al-Izz River in the famous area of marshes, which is a very distinguished area and is well-known landmark for Iraq. The bridge has a length of 100 m.

AL-QAMISHLI INTERCHANGE, Baghdad-Hilla, Iraq

AL-QAMISHLI INTERCHANGE, Baghdad-Hilla, Iraq

Date: 2012 Duration: 6 months Construction Budget: 12 M USD Client: Bairaq-el-Ameer Company for General Contracting and Trading Beneficiary: Baghdad Governorate Awarding body: Baghdad Governorate Awarded body: Bairaq-el-Ameer Company for General Contracting and Trading This proposal for an interchange in the City of Baghdad. Dijlah office has prepared the complete designs of this interchange as a part of Baghdad – Hilla road development project. It consists of 3 curved ramps and linear ramps.

AL_TESAANE INTERCHANGE (PROPOSAL)

AL_TESAANE INTERCHANGE (PROPOSAL)

Diyala, Iraq Date: 2010 Client: Project International FZE This is proposal for interchange in Diyala City.

AL-YARMOUK INTERCHANGE

AL-YARMOUK INTERCHANGE

Mosul, Iraq Date: 2007 Client: Ministry Municipalities & Public Works Budget: US$ 23 M For this interchange, traffic study was taken into consideration in design. This is a major interchange in the city of Mosul and is the largest in scale and cost among 5 interchanges that were designed by DIJLAH. It contains a major and minor overpass with an accurate and complex network of roads. Besides, a tunnel is added to make the traffic flow more flexible.

AL-SALAM  INTERCHANGE

AL-SALAM INTERCHANGE

Baghdad, Iraq Date: 2009 Client: Baghdad Mayoralty Budget: US$ 18 M The interchange is located in Baghdad (Karkh side) and connects the Al-Bayya' district with the expressway (Salahuddin Al-Ayubi St.) in the direction of North of Baghdad to reduce congestion that occurs at the intersection which connects Al-Bayya' district and Al-Amil district with Al-Jihad district. The work involves the preparation of the intersection and the bridge design of the interchange.

NADIR INTERCHANGE

NADIR INTERCHANGE

Hilla, Iraq Date: 2007 - 2011 Client: Ministry Municipalities & Public Works Budget: US$ 25 M DIJLAH prepared all the necessary engineering drawings and documents for Nadir Interchange in Babylon, Iraq. This project consists of a 2-sided overpass with 4 curved and 4 linear ramps. Traffic study was taken into consideration in our design. In addition to the overpass, roads were designed with all required approaches. Currently, this project is under construction

AL-SHUHADA' INTERCHANGE

AL-SHUHADA' INTERCHANGE

Kirkuk, Iraq Date: 2005-2006 Client: Ministry Municipalities & Public Works Budget: US$ 6 M For this interchange, traffic study was taken into consideration in design. This is a major interchange in the city of Kirkuk. It consists mainly of one 2-sided overpass with all required approaches.

AL-MAFRAQ INTERCHANGE

AL-MAFRAQ INTERCHANGE

Diyala, Iraq Date: 2005-2006 Client: Project International FZE Budget: US$ 15 M DIJLAH prepared all the necessary drawings and documents for Al-Mafraq Interchange in Diyala, Iraq. This project consists of a 2-sided overpass with 4 curved ramps and 4 linear ramps, 2 curved ramps of them are designed in future extension. Traffic study was taken into consideration in our design. In addition to the overpass, roads were designed with all approaches needed.

UQBAH BIN NAFI` INTERCHANGE

UQBAH BIN NAFI` INTERCHANGE

Baghdad, Iraq Date: 2007 Client: Baghdad Mayoralty Budget: US$ 13 M The intersection is located in Baghdad (Al-Rasafah side) which connects Al-Tahariyat Square in the Karradah district. The goal is to reduce traffic congestion in Al Za`farniya, Al Bab Al Sharqi route, one of the busiest intersections in Baghdad. The bridge is 500 m in length, 2 directions and 11 spans.

DEVELOPMENT OF BAGHDAD ABU GHRAIB

DEVELOPMENT OF BAGHDAD ABU GHRAIB

Baghdad, Iraq Date: 2012 Client: Bairaq Al-Ameer General Trading & Contracting Ltd. Budget: US$ 10 M This is a proposal for Abu Ghraib Street development in Baghdad.

Sa'ad Square - Basra

Sa'ad Square - Basra

Basra, Iraq Date: 2006 Client: Ministry of Municipalities and Public Works. Budget: US$ 8 M Sa'd Interchange in Basra City, Iraq. For this interchange, traffic study was taken into consideration in design. In addition to the overpass, roads were designed with all approaches needed. This project consists of a 2-sided overpass with 4 curved ramps and 4 linear ramps.

AL-HUSSEIN INTERCHANGE

AL-HUSSEIN INTERCHANGE

Baghdad, Iraq Date: 2009 Client: Baghdad Mayoralty Budget: US$ 15 M One of interchanges proposed to be constructed in Baghdad to reduce the traffic congestion and traffic bottlenecks for the connecting roads between Al-Amil and Al-Hussein districts and the main road North of Baghdad toward Mosul. The interchange has a length of 550 m, 2 directions and 13 spans. The drawings and technical specifications for this interchange according to by SCRB standards.

TIS'IN INTERCHANGE

TIS'IN INTERCHANGE

Kirkuk, Iraq Date: 2007 Client: Project International FZE Budget: US$ 8 M The intersection TIS'IN project is one of the important and strategic projects implemented by the Ministry of Municipalities at a cost of 21 billion and 876 million IQD within the investment budget for the Ministry of Municipalities. The project of the interchange has a length of 680 m and width 14 m, while the total length of the secondary interchange is 133 m and width 8 meters.

60TH ST DEVELOPMENT IN AL- AMARAH

60TH ST DEVELOPMENT IN AL- AMARAH

Amarah, Iraq Date: 2010 Client: Maysan Government Council Budget: 4.5 M USD We have designed & developed 60th street in Amarah which begins from Al_Hussian interchange to the end edge of Baghdad/Amarah St., the development proposed many high rise office buildings, residential complex, and rehabilitation and redesign some buildings to reflect new panoramic façade to this area also giving power for Maysan Government.

CITY INTERCHANGE Najaf

CITY INTERCHANGE Najaf

Najaf, Iraq Date: 2010 Client: Al-Khadraa Co Budget: US$ 26 M Two Proposals were submitted for this interchange in the Holy City of Najaf.

AL-TALA`I` INTERCHANGE

AL-TALA`I` INTERCHANGE

Baghdad, Iraq Date: 2008 Client: Baghdad Mayoralty Budget: US$ 32 M This project is considered one of the most complicated traffic intersections in Baghdad (Karkh area). It connects Al-Rahmanyia with July 14 St. and back with length 1 Km with design of 4 connecting loops with each length of 400 m. The interchange runs above railway tracks which comes from Al-Admiyah Station with ensures the avoidance of using the tracks ROWs thus the spans in points reached 50 m.

CONSULTING SERVICES - ROADS & BRIDGES – IRAQI – GERMAN CREDIT FACILITY, Nineveh & Salahd

CONSULTING SERVICES - ROADS & BRIDGES – IRAQI – GERMAN CREDIT FACILITY, Nineveh & Salahd

Date: 2017 Duration: 3 months Construction Budget: 73 M USD Client: Gopa Infra GmbH Beneficiary: Ministry of Construction, Housing and Public Municipalities Awarding body: German Kfw Bank & Iraqi ‘Reconstruction Fund for Areas Affected by Terroristic Operations’ (ReFAATO) Awarded body: JV companies led by Gopa Infra GmbH Dijlah was a partner in JV project with other companies in consulting services, documents review and preparation for roads bridges infrastructure rehabilitation.

SHUTAYT AL-NASR, Thi Qar, Iraq

SHUTAYT AL-NASR, Thi Qar, Iraq

Date: 2005 Duration: 1 year Construction Budget: 8 M USD Client: Ministry of Municipalities & Public Works Beneficiary: Ministry of Municipalities & Public Works Awarding body: Ministry of Municipalities & Public Works Awarded body: Dijlah Consulting Engineers For this interchange, traffic study was taken into consideration in design. This is a major interchange in Shutayt Al-Nasr in Thi Qar Governorate. This interchange consists mainly of one 2-sided overpass with all required approaches.

AL-DARWISH INTERCHANGE, Baghdad, Iraq

AL-DARWISH INTERCHANGE, Baghdad, Iraq

Date: 2007 Construction Budget: 22 M USD Client: Baghdad Mayoralty Beneficiary: Baghdad Mayoralty Awarding body: Baghdad Mayoralty Awarded body: Dijlah Consulting Engineers Dijlah prepared the complete designs including the additional designs regarding the conflicts with the existing services of water pipelines, sewerage, and electrical networks.

BRIDGES OVER RAILWAYS, Basra, Iraq

BRIDGES OVER RAILWAYS, Basra, Iraq

Date: 2007 Duration: 1 year Construction Budget: 1.75 M USD Client: Iraqi Railways Company Beneficiary: Iraqi Railways Company Awarding body: Iraqi Railways Company Awarded body: Dijlah Consulting Engineers DCE prepared the complete detailed designs, soil investigations, and topographic surveys for three car bridges projects which pass over the railways network in Basra governorate.

AL-MAHMUDIYAH INTERCHANGE, Baghdad-Hilla, Iraq

AL-MAHMUDIYAH INTERCHANGE, Baghdad-Hilla, Iraq

Date: 2012 Duration: 6 months Construction Budget: 8 M USD Client: Bairaq-el-Ameer Company for General Contracting and Trading Beneficiary: Baghdad Governorate Awarding body: Baghdad Governorate Awarded body: Bairaq-el-Ameer Company for General Contracting and Trading Dijlah has prepared the designs of this interchange as a part of Baghdad – Hilla road development project. Its length is about 500 m and it connects the roads network of Al-Mahmmudiyah city to Baghdad – Hilla road.

QURNA – MDAINA ROAD, Basra, Iraq

QURNA – MDAINA ROAD, Basra, Iraq

Date: 2013 Duration: 3 months Construction Budget: 1.1 M USD Client: Taj Halab for General Contracting Company & E’mar Al-Badiya for General Contracting Company Beneficiary: Basra Governorate Awarding body: Basra Governorate Awarded body: Taj Halab for General Contracting Company & E’mar Al-Badiya for General Contracting Company Dijlah designs the second carriage way of Qurna – Mdaina road in Basra governorate. including soil investigation, topographic survey, and engineering designs.

AL-QARYA AL-ASRIYA INTERCHANGE, Baghdad, Iraq

AL-QARYA AL-ASRIYA INTERCHANGE, Baghdad, Iraq

Date: 2010 Client: Al-Khadraa Al-Motaheda Co. Beneficiary: Ministry of Municipalities & Public Works This is a proposal only. Dijlah prepared the preliminary designs and studies for this interchange nearby Haswa city at the main road between Baghdad and Hilla. Three proposals were prepared for project submission purposes with the partner company Al-Khadraa Al-Motaheda.

ZOYOUT INTERCHANGE IN RAMADI CITY, Al-Anbar, Iraq

ZOYOUT INTERCHANGE IN RAMADI CITY, Al-Anbar, Iraq

Date: 2010 Client: Al-Khadraa Al-Motaheda Co. Beneficiary: Ministry of Municipalities & Public Works This is a proposal only. Dijlah prepared the preliminary designs and studies for this interchange in Ramadi city at for project submission purposes with the partner company Al-Khadraa Al-Motaheda.