- TRANSPORTATION PROJECTS -
BAGHDAD ELEVATED TRAINBaghdad, Iraq Commencement Date: February 10, 2013 Budget: US$ 1.6 Billion Client: Baghdad Governorate Awarded to: ALSTOM TRANSPORT SA, (SYSTRA is the consultant subsidiary of ALSTOM for this project). BET project has a route of 21.5 km in length. This project was awarded to the French firm, Alstom Transport SA. The role of DIJLAH is to undertake all the soil investigation, topographic surveys, draw utilities and infrastructures. | BAGHDAD UNDERGROUND METROBaghdad, Iraq Date: 2011 - 2017 Client: Baghdad Mayoralty Awarded to: SYSTRA (French Consultant Firm) [Design and Studies] Estimated construction cost: 6 Billion USD Baghdad Underground Metro (BUM) is a vital mass transit project that was awarded to SYSTRA, the well-known French firm recognized as one of the best in mass transit companies in the world. The BUM project consists of 2 lines with a total length of (52 km) with (47) stations. Line (1) is in Rusafa only |
---|