Date: 2012
Duration: 2 months
Construction Budget: 1.5 M USD
Client: Lalah Company for Contracting
Beneficiary: Baghdad Investment Commission
Awarding body: Baghdad Investment Commission
Awarded body: (Proposal only)
Dijlah prepared the preliminary designs and economic feasibility study
for this local market. The site area is 1750 m2.The design consists of ground and first floor with open café at the rooftop, the feasibility study includes all the properties of the market, construction cost. Etc