BAGHDAD – ABU GHRAIB ROAD

projects image

Date: 2012
Client: Baghdad Governorate
Contractor: Bairaq Al-Ameer General Trading & Contracting Ltd.
Budget: US$ 10 M
Dijlah has prepared the preliminary studies and designs to develop Baghdad – Abu-Ghraib road 18 km lengths.

Related Projects

BAGHDAD UNDERGROUND METRO

BAGHDAD UNDERGROUND METRO

BAGHDAD ELEVATED TRAIN

BAGHDAD ELEVATED TRAIN

SECURITY AND CONTROL CHECKPOINTS

SECURITY AND CONTROL CHECKPOINTS

No results found.