Baghdad, Iraq
Date: 2011 – 2017
Client: Baghdad Mayoralty
Awarded to: SYSTRA (French Consultant Firm) [Design and Studies]
Estimated construction cost: 6 Billion USD
Baghdad Underground Metro (BUM) is a vital mass transit project that was awarded to SYSTRA, the well-known French firm recognized as one of the best in mass transit companies in the world. The BUM project consists of 2 lines with a total length of (52 km) with (47) stations. Line (1) is in Rusafa only