EX-POST EVALUATION OF “AL-MUSSAIB THERMAL POWER PLANT REHABILITATION PROJECT (ODA LOAN; L/A NO. IQ-P3)”

projects image

Date: November 2023
Duration: 12 months
Client: i2i Communication, Ltd., Japan

Beneficiary: JICA (Japan International Cooperation Agency)

Dijlah is the local evaluator

This evaluation are provided to JICA by carrying out the ex-post evaluation of JICA-assisted project in Iraq for Al-Mussaib Thermal Power Plant Rehabilitation Project (L/A No. IQ-P3) in Babylon Governorate.

Related Projects

ASSISTANCE IN THE STUDY ON THE EX-POST EVALUATION OF  JICA – ASSISTED PROJECTS IN IRAQ

ASSISTANCE IN THE STUDY ON THE EX-POST EVALUATION OF JICA – ASSISTED PROJECTS IN IRAQ

THE EX-POST EVALUATION OF A JICA-ASSISTED PROJECT IN IRAQ, COMMUNICATIONS NETWORK DEVELOPMENT PROJECT FOR MAJOR CITIES

THE EX-POST EVALUATION OF A JICA-ASSISTED PROJECT IN IRAQ, COMMUNICATIONS NETWORK DEVELOPMENT PROJECT FOR MAJOR CITIES

Achievements of Cooperation in Iraq” (Evaluation Analysis)/ JICA FY2023 Evaluation of ODA Projects”

Achievements of Cooperation in Iraq” (Evaluation Analysis)/ JICA FY2023 Evaluation of ODA Projects”

No results found.