Basra, Iraq
Date: 2006
Client: Ministry of Municipalities and Public Works.
Budget: US$ 8 M
Sa’d Interchange in Basra City, Iraq. For this interchange, traffic study was taken into consideration in design. In addition to the overpass, roads were designed with all approaches needed. This project consists of a 2-sided overpass with 4 curved ramps and 4 linear ramps.