Karbala, Iraq
Date: 2007 – 2011
Client: Project International FZE
Budget: US$ 15 M
For this interchange, traffic study was taken into consideration in design. In addition to the overpass, roads were designed with all approaches needed. Currently, This project consists of a 2-sided overpass with 4 curved ramps and 4 linear ramps.