Sulaimanyia, Iraq
Date: 2007-2008
Client: Ministry of Health/World Bank
Budget: US$ 4.5 M
This is an existing hospital that was built in the early eighties. Then, several additions were added within different periods. Our mission was based on two issues: issue one is to design a new unit for recovery (24 beds). Issue two is to rehabilitate the existing part of labor-delivery/caesarean operation-recovery. Also, our firm is responsible for the supervision stage.